In late March, the Northeast Ohio Regional Sewer District announced an agreement with the Ohio Department of Transportation to utilize $650,000 in state money to create a Green Infrastructure Grants Program. The grants will be aimed at offsetting the effects of the Opportunity Corridor using green infrastructure rather than building storm sewers. Limited space and immense existing underground utility infrastructure played into this decision. The $331 Opportunity Corridor will encompass nearly 405 ha (1000 ac) on Cleveland’s southeast side, and its first phase will generate an estimated 2270 m3 (600,000 gal.) of runoff annually. The sewer district also is contributing $250,000 toward the grant program for managing combined sewer overflows. Read more.
Featured Products
Style 711/731 ProFlex™ Check Valves – Proco Products
January 15, 2021What is a check valve and why is it useful? Check […]Filterra® Bioretention System – Contech Engineered Solutions
January 13, 2021Filterra® Bioretention – Low Impact Development […]sEAmless Compliance Portal – EA Engineering, Science, and Technology, Inc., PBC
January 21, 2021EA Environmental, Health, Safety and Sustainability […]Atkins Water Practice – Atkins/SNC-Lavalin
January 21, 2021At SNC-Lavalin’s Atkins business, we take advantage of […]PipeCAST™ Monitoring Platform — CDM Smith
January 19, 2021PipeCAST™ — Actionable Engineering Insights, Right at […]
WEF Stormwater on Twitter
Tweets by @wefstormwaterHappening @ WEF
Polls

Storm Events
There are no upcoming events.
Rolling rain gardens make a splash at the Port of Seattle
http://www.king5.com/news/cities/seattle/Rolling-rain-gardens-at-Port-of-Seattle-256103741.html