On Nov. 9, the Tennessee Healthy Watershed Initiative announced $750,000 for nine watershed improvement projects. Knox County was awarded $95,400 in funding to complete Phase 2 of the Harrell Road Stormwater Demonstration Park. The 6-ha (15-ac) park is on a previously abandoned tract. A wetland will filter runoff, and the park will contain other stormwater controls, including a rain garden and pervious pavement, with descriptive signage. The park will include 1219 m (4000 ft) of trails and boardwalks for viewing birds and other wildlife. Read more.
Related Posts
Featured Products
Style 711/731 ProFlex™ Check Valves – Proco Products
January 15, 2021What is a check valve and why is it useful? Check […]Filterra® Bioretention System – Contech Engineered Solutions
January 13, 2021Filterra® Bioretention – Low Impact Development […]sEAmless Compliance Portal – EA Engineering, Science, and Technology, Inc., PBC
January 21, 2021EA Environmental, Health, Safety and Sustainability […]Atkins Water Practice – Atkins/SNC-Lavalin
January 21, 2021At SNC-Lavalin’s Atkins business, we take advantage of […]PipeCAST™ Monitoring Platform — CDM Smith
January 19, 2021PipeCAST™ — Actionable Engineering Insights, Right at […]
WEF Stormwater on Twitter
Tweets by @wefstormwaterHappening @ WEF
Polls
