By mid-February, the U.S. Environmental Protection Agency (EPA) is scheduled to release a final construction general permit (CGP) for 2012. It will not include numeric turbidity limits, and states not using EPA’s CGP will not be required to incorporate the limit and associated monitoring requirements into their permits. EPA stayed the numeric turbidity limit of 280 nephelometric units to correct a calculation error when establishing the 2009 effluent limitation guidelines. To devise a new limit, the agency is seeking more data on the cost, feasibility, and effectiveness of technologies for controlling turbidity in construction discharges, especially regarding passive treatment. Comments are due March 5. See the Federal Register notice.
Related Posts
Featured Products
Style 711/731 ProFlex™ Check Valves – Proco ProductsJanuary 15, 2021What is a check valve and why is it useful? Check […]
Filterra® Bioretention System – Contech Engineered SolutionsJanuary 13, 2021Filterra® Bioretention – Low Impact Development […]
sEAmless Compliance Portal – EA Engineering, Science, and Technology, Inc., PBCJanuary 21, 2021EA Environmental, Health, Safety and Sustainability […]
Atkins Water Practice – Atkins/SNC-LavalinJanuary 21, 2021At SNC-Lavalin’s Atkins business, we take advantage of […]
PipeCAST™ Monitoring Platform — CDM SmithJanuary 19, 2021PipeCAST™ — Actionable Engineering Insights, Right at […]
WEF Stormwater on Twitter
Tweets by @wefstormwaterHappening @ WEF
Polls
Storm Events
There are no upcoming events.





