The Montana Federal District Court ruled that it would be more efficient to address total maximum daily loads (TMDLs) on a watershed basis than by individual waterbodies. The decision made in Friends of the Wild Swan, et al. v. EPA, et al. amended a 2004 court order that required Montana to address all waterbodies listed in the state’s 1996 list of impaired waters by the end of 2012. The recent federal court decision gave the state an additional 2 years to achieve compliance, but included waterways not listed as impaired in the 2004 court order.
Related Posts
Featured Products
- Style 711/731 ProFlex™ Check Valves – Proco ProductsJanuary 15, 2021What is a check valve and why is it useful? Check […]
- Filterra® Bioretention System – Contech Engineered SolutionsJanuary 13, 2021Filterra® Bioretention – Low Impact Development […]
- sEAmless Compliance Portal – EA Engineering, Science, and Technology, Inc., PBCJanuary 21, 2021EA Environmental, Health, Safety and Sustainability […]
- Atkins Water Practice – Atkins/SNC-LavalinJanuary 21, 2021At SNC-Lavalin’s Atkins business, we take advantage of […]
- PipeCAST™ Monitoring Platform — CDM SmithJanuary 19, 2021PipeCAST™ — Actionable Engineering Insights, Right at […]
WEF Stormwater on Twitter
Tweets by @wefstormwaterHappening @ WEF
Polls
Loading ...